Friday 31 March 2017

1 week of tiling!!

Another Friday another trip out to the block. This is quickly becoming our Friday night entertainment. I got some pictures but sorry they aren't very good, we are locked out. I got the photos through the windows but they are so dirty it is hard to see in. The colours in the photo aren't true colours. The kitchen is throwing a brown colour in these pictures but its actually grey to the eye. Anyway the tiler has been busy. He has now done the laundry, splash back, ensuite floor and front landing. I cant see the bathroom but I think that would have been done too. Our SS said we have about 4 weeks left. I must say I am getting excited but looking at the swamp on the side of the house takes me back to our last build. So much mud. It takes a good year to be complete. It will be an adventure and keep us busy.




Splashback tile

I can see the laundry tiling

Front porch tiling


Bathroom floor and feature wall tile

Kitchen with shelves in WIP

Swamp down the side. I didnt brave the mud, but you can get a glimpse of the laundry tile.


Backyard looking at the mowed grass on the other side of the fence.



Windows are so dirty

No comments:

Post a Comment